Alexandra – 1/4 Olympic Swimming Pool

This pool shape is in the manufacture stage the pool is 1/4 Olympic and boasts the 2m deep end with twin skimmers, big filtration a good pool for big areas .

These pools can be installed and at the end of the project the area can be bought back to bush and the pool and all equipment then moved to the next camp.

These pools are designed around low maintenance and good quality water for all those that swim in her.  The breakfast area can have spa jets added and/or a removable table.  They are constructed with high quality gelcoat and vinyl resins to illuminate black spot.  Backed up with the best colour range available in Aust and long lasting surfaces these pools make a good choice for anyone to swim in. This makes a great mining camp pool installed in 1 month complete and that’s a turnkey install.

Category: Tag:

Comments are closed.

EnglishFrenchGermanNorwegianRussianThai